Showing posts with label Alex Procyk. Show all posts
Showing posts with label Alex Procyk. Show all posts

Monday, March 31, 2008

Was thinking of Alex....

Heck, I'd be drawn to some esoteric trains if I saw them and they were anything like the scale shown here. I thought of Alex (one of the blog authors) when I saw this Marklin ad.


Marc

Wednesday, June 06, 2007

Track - how not to do it

In Greenberg's book on Carlisle and Finch, Graham Claytor wrote that one of the main reasons they failed as a train company was because they never developed sufficient track for the masses. I have written in previous blogs about the craptacular nature of their track. You choice was either strip rails set into individual ties, or prefab stuff made out of wood wood ties with rails nailed in with carpet tacks. The former was only for permanent set ups and was a painful thing to put together, the latter was fragile, flimsey and frequently got out of gauge. This was a far cry from Lionel's 120 lb track that would withstand a car running over it and could be set up in minutes.

But if that wasn't bad enough, try this:


This is Beggs live steam track. Each curve is composed of three wood blocks with rails embedded into slots cut into the blocks by some unknown and magical process. Rail connections are simply made with overhanging rail on one end fitting into the slots into the next piece where the rail comes up short. Since Beggs engines were live steam, there was no need for electrical conductivity. Sounds kinda limited? well, there's more (or less, depending upon your point of view): Beggs designed it so that 7 sections made a circle. How are you supposed to make an oval when 7 sections make a circle? You aren't because most Beggs engines were made with the pilot wheels fixed to run in a predetermined radius. The engines couldn't go straight. The cars even had different diameter wheels, larger on one side than the other, to give them less rolling resistance going around the circle. The more delux Beggs engines did in fact have real pivoting pilots and were made run on ovals, however Beggs straight track is very rare and most went in circles. You would think this was very limiting and would result in a quick fold-up of the company, but in fact Beggs and its sucessor McNair produced trains from about 1875-1910; a good long run. I guess in the late 1800's getting a live steam toy to run around in circles was probably the highlight of your week....Here's what a complete set looked like:



Monday, April 02, 2007

making an elevated railway

Marc asked for tips and strategy for making elevated railways. He wants to run an elevated 2 7/8" line. Mazel Tov!

Making and elevated line is all about 2 things

1) What do you want it to look like?

and

2) How much time do you want to put into it?

We all need to answers those for ourselves. As for me, I had two simple requirements: I wanted it to look late victorian/ early Edwardian. This was before the whole Bauhaus movement that said form should follow function and ornamentation was frowned upon. I love Bauhaus, but my collection is Edwardian. So that meant my elevated posts had to be a bit frilly. The second requirement was that the track be supported by a substructure. Every toy train company that made elevated posts did just that, made posts to elevate the tracks. There was no substructure, the rails supported the trains between the posts, and the track just kind of hung in mid air. This goes for post war Lionel and Gilbert trestle sets as well.I really really do not like this look.


So as far as posts go, ideally I would like to have used Carlisle and Finch posts, but can't find any, even repros (see pics, and notice how ornate they are).




I thought about using cut down turned coffee table legs from Lowes (see picture, either end up), but decided against it because I thought it would look too fat. Thinking back, I don't think this would have been a bad idea, and would certainly try it for 2 7/8" gauge. However in the end passing on it was the right choice because some of my trains just barely clear the skinnier posts I used.



What I ended up doing was turning all 11 damn posts myself on a lathe. This took forever. The post design was pretty much the first thing I came up with on the first attempt. Nothing too fancy, some bumps and a bulge at the top. I really should have made some "arms" that stick out to support the sides of the track but got lazy. Actually the first post I made was quite a bit taller than this. I didn't want the trains too high in the air and played around with the height before committing to making more posts. My posts are 8 1/2" high and will clear everything except maybe a 200 series crane with the boom up. Someone with more interest than I can find out the real New York Elevated height and come up with a correct post height (standard is what - 1/26 scale? around 15.5/32" = 1'? So 8-1/2" is about 18.7').


Looking at the actual New York elevated RR trestles, I would probably do it differently now. Instead of round posts I probably would go with something more like Lionel 2-7/8" posts with lattice work. Lowes or Home Despot should have some kind of preperforated strip metal that can be used.


The other criteria was that the track be supported by a base. I used 3/8" square basswood, some more straight than others. One under each rail. I thought the rails would straighten them out but they didn't and parts of the elevated suffered for it. These were laid first lengthwise on a jig, the ties glued on top crosswise using voltamp, or repro voltamp ties in between for temporary spacers, and the standard gauge rails screwed down to the ties. The track was made in individual sections that can be taken apart like ordinary track when I move. If you are going to use 2-7/8" or 2" gauge strip rail, the ties need to be lined up so that the slot in the ties is in a straight line. The rail can be inserted after the elevated is set up. For the curves I cut the 3/8" wood into 3/8"x1/8" strips and bent three of them around a jig the same radius as the curved rails and laminated them together. Like the straights, ties glued on top, rail screwed to the ties. Again for strap rail-in-groove track it would be very important to lay the ties out such that the groove was lined up and even for the rail to slide in.




And that is about it.

-Alex

Saturday, March 31, 2007

Seeing old things new again

Sometimes when you move you old stuff around into a different context, something new pops out. Like staring at one of those pictures of two silhouette profiles facing each other and then seeing it resolve into a vase. Usually I run my Finch 20 with freight cars, and my Lionel repainted day coaches with a Lionel #6 or Finch 34. Instead I happened to put them on the elevated line to clear the lower tracks for another train. Then I noticed something:





The #20 with day coaches looked really familiar. In fact, it looked an aweful lot like an early New York Elevated Railway train, which were run with Forney 0-4-2's before the cars were converted to electric operation.

(from http://www.ironhorse129.com/rollingstock/CandS/dsp-passenger/nyelrail1.htm).

The 20 isn't a Forney, and its too big for the cars, but for a toy it could pass for an elevated train. The earlier Finch 20 would work better because it didn't have cowcatchers. I don't think you find many cows on elevated rights of way. Now I am all hot and bothered to get 3 crappy day coaches to turn into elevated railway cars. From the looks of things, I just need to add some extra railing detail, fool with the windows a bit, lose the steps, move the trucks out, and add marker lights. I'd prefer to work with repros, but what are you going to do?
-Alex

Saturday, March 24, 2007

I forgot to introduce....

Forgot to introduce Alex Procyk to everyone! Coming off the high of Jim Kelly's Tinplate Times article, Alex is going to add some wrinkles to the old Blog (hopefully adding wrinkles won't equate to a hang over).

At any rate, I am hoping Alex does ALOT of writing for us. By the way Alex, I'll take a #10 set in all it's "crapitude".

I think it was Will Rogers that said "Never met a man I didn't like." Same goes for trains.

Welcome aboard!

Marc

Friday, March 23, 2007

In Praise of Roadbed



Well, I broke another promise to myself. The first one was that I was going to be the last white man in Houston to do my own lawn (you have to realize, I come from a Northern blue collar town where, to quote Garrison Keillor, an able-bodied man would no more have someone do his lawn than cut his food). But down here the lawn cutting season runs all year long and labor costs are, ahem, minimal (I have an agreement with my guy, I don't check his INS status, he doesn't look at my tax returns). A quick reflection on the time/money ratio finally brought me around...five years too late if you ask me. But I digress (actually, you can't really digress until you get to the point first). I had promised that my layout would be strictly period - nothing would be on it that was made after 1915 (except the MTH std gauge track - nothing is more miserable than trying to get trains to run on old track). That also goes for the materials - only plaster and wood. However, ever since I saw Tom Sefton's layout in "Great Toy Train Layouts", I had been enamored with Lionel's rubber roadbed. It was patented in 1930, quite a bit later than my layout's period date. I wasn't enamored with a comment I read somewhere that said it took him 20 years to acquire it all (over 600 feet!). I had not seen much of it at train shows, and when found, it was always too expensive. Fortunately Ebay seems to have increased the supply, and the average prices, as far as I can tell, haven't changed much since the 80's when I started getting into standard gauge. Throw in a little inflation and now it doesn't seem so expensive anymore, at least for a small oval like mine. And in fact, with a little digging it can be inexpensive. I completely forgot to bid on a lot of it in Stout's Auction a month or so ago (and I mean "lot" as in a lot - about 50 pieces, pretty evenly divided between straight and curve), and it went for less than $2.00 per piece. Another lot showed up on Ebay a few weeks later and to atone, I bought it for about 5 times that price. I only got 6 curve and 12 straight, but the high price was probably because I got two switch bases and a crossing base. Of course I have no crossing and only one switch on my layout (me and the Galapagos Finches are the prime exhibits to disprove Intelligent Design). Installation was a piece of cake, but true to form, I couldn't use the switch base because there wasn't enough clearance with a nearby track. So a friend of mine helped out by digging up some pretty bad pieces that wouldn't be sacrilege to cut up and fit under a switch. If you look closely, horrible things were done to this poor split pin Lionel switch. One swivel rail was removed and a jumper for the early Lionel slider shoes installed across the gap (not attached when the pic was taken), the other swivel rail was spiked into place, and the switch stand had to be removed and museum-waxed into place closer to the rails to avoid being hit by a Carlisle and Finch Interurban on the other track. Don't cry for it, it was a pretty shot switch when I got it, and I can reverse all the changes.

Anyway I would highly recommend using roadbed. That is, unless you like the loud rumbling effect of Standard gauge on a plywood table top; the roadbed really cuts down the sound. I don't know why MTH doesn't recreate this stuff. It seems to me that every layout is a potential market and its a good way to increase the appearance of the track. In fact, its a great way to add something new to an existing layout without having to create new real estate. The fact that I work to produce petroleum, chief component of rubber, has no bearing on my opinion. Lets face it, the 4-wide-ties-per-section look is getting really old (marklin came out with it arond 1891). Note how good the 2" gauge Finch track looks compared to the Lionel tubular track; the roadbed at least helps even the score.

P.S. no need to point out the conditional craptitude of the Lionel 10 set, and the fact it was made in 1925, not 1915. It was the first Standard gauge set my dad bought me, and he didn't buy much more. Its a keeper.
- Alex P